Track a basement conversion, from damp-proofing to the finished room
A basement conversion is won or lost on moisture. The damp-proofing, the drainage and the insulation are the expensive parts, and they are all hidden once the room is finished.
Home Stories keeps those costs apart from the finishes, so you see what the dry room cost before the carpet. The photos of the membrane and the sump are the record you want if water ever comes back.
What to keep in the project
-
Moisture work first
Tanking, membrane, sump pump and drainage as their own items, so their cost stays visible.
-
Photos of the walls and floor
Photograph the membrane, the drainage and the insulation before the stud walls are boarded.
-
Electrics and ventilation
Keep the electrician's certificate and the fan's manual as documents.
-
Finishes on their own
Flooring, lighting and paint as items, so you can cut back here if the moisture work ran over.
How to set it up in Home Stories
- Create a "Basement" project with a budget and a contingency.
- Add the moisture work as items before anything else.
- Photograph the walls and the floor at each stage.
- Keep certificates and warranties as documents.
- Add the finishes last.
Free on iPhone and iPad (iOS 17 or later). No account, works offline. Pro is an optional one-time purchase for the budget-vs-actual chart, task reminders, PDF export, iCloud sync and project sharing.
Frequently asked questions
What is the most important thing to record in a basement conversion?
The moisture work: the membrane, the drainage and the sump. Photograph it before it is covered and keep the warranty as a document.
Can I set a contingency for hidden problems?
Yes. Set the project budget to include the contingency, and keep the moisture work as its own items so you see how much of the contingency it used.
Does the app work in a basement with no signal?
Yes. Home Stories works offline. If you use iCloud sync (Pro), it catches up when you are back online.
Further reading
-
Renovation Contingency Budget: How Much to Set Aside and Why Renovation contingency budget — why you need 15-20% extra, where surprises come from, and how to track your contingency. -
Hidden Costs in an Older Home: The Surprises That Blow Budgets Older homes hide expenses that catch renovators off guard — old wiring, rot, structural surprises, and more. What to budget for and how to avoid budget shock. -
How to Document Your Home Renovation for Insurance What a renovation insurance claim actually needs: the photo timeline, the paper trail, and the honest disclosure most people forget — all before you need it.